Darrington Village Field Trust approached Wicksteed to provide a design and quotation for the refurbishment of their local playground in Darrington, near Pontefract. As experts in delivering tailored playground solutions, we worked closely with the committee to ensure the design was fit for purpose and met the needs of the local community. From the outset, Wicksteed provided a comprehensive service, meeting with the committee and delivering an excellent initial design and quotation that aligned with the project’s goals.
Wicksteed provided a full range of new equipment, including the removal of old timber items and the installation of a Viking Swing set with two cradle swings and one inclusive seat, Tom Thumb Toddler Multiplay Unit, a Spin-a-Bounce, and a Buddy Board. The project also included the Perlu Multiplay Unit from our XS Cyclone Range for older children. In addition, the existing slide and roundabout were refurbished, with fresh paintwork and new wet pour surfacing to ensure safety and aesthetics.
The new play equipment now caters to all age ranges, ensuring inclusivity and offering challenges where possible. The feedback from local children has been overwhelmingly positive, and the committee is thrilled with the final outcome, which has truly revitalised the playground.
Jenna, a member of the Darrington Village Field Trust, praised the experience, saying, "Wicksteed has been superb throughout the whole process, and I would not hesitate to recommend them to anyone wanting a company to install play equipment." .
As a charity, we had to seek a grant in order for us to be able to purchase any equipment. However, in order to get the grant we had to have firm designs and quotations. Despite knowing there was no guarantee we would end up with the funding , Wicksteed provided us with top class service from the beginning - meeting us and providing an excellent initial design and quotation. We made further amendments to the design numerous times once our funding was secure and the sales team were always happy to help and delivered in a very timely manner. Installation was very smooth and finished before schedule so we could have a grand opening in conjunction with the local school breaking up for summer.
Our new play equipment provides everything we asked for - covering all age ranges and providing inclusivity and challenge where possible. Feedback from local children has been excellent and as a committee we are really happy with the outcome.”